WEBVTT 00:00.270 --> 00:02.589 The wing skin is firmly on the shank of 00:02.599 --> 00:04.543 the bolt . So that's why we had to 00:04.543 --> 00:07.500 drive it in and out . So when we go 00:07.510 --> 00:09.677 back in , we'll put a layer of sealant 00:09.677 --> 00:12.060 on it here and completely cover this 00:12.069 --> 00:14.069 area . Caleb reid the work lead for 00:14.069 --> 00:16.180 fuel system repair explains how we're 00:16.180 --> 00:18.469 going to fix a pesky problem . We've 00:18.479 --> 00:20.790 been making several attempts on this 00:20.799 --> 00:23.590 particular leak since what I think it 00:23.639 --> 00:25.930 was June . So to keep the aircraft in 00:25.940 --> 00:27.551 the rotation to meet mission 00:27.551 --> 00:29.773 requirements , this crew performed what 00:29.773 --> 00:33.290 they called quick fixes called out , we 00:33.299 --> 00:35.650 put the epoxy on the outside and just 00:35.659 --> 00:37.826 get it to stop . And as long as we can 00:37.826 --> 00:39.826 successfully stop the leak with the 00:39.826 --> 00:43.189 epoxy , then our t allow the , but 00:43.200 --> 00:45.740 these repairs are only good for so long . 00:45.759 --> 00:48.037 There's limits on how much it can leak , 00:48.037 --> 00:50.459 but it's very small limits . So if we 00:50.470 --> 00:52.729 don't correct it properly , the first 00:52.740 --> 00:54.796 time we're going to end up having to 00:54.796 --> 00:56.796 come back , it's going to come back 00:56.796 --> 00:59.018 into the hangar and we're going to work 00:59.018 --> 01:01.240 another , who knows how long to correct 01:01.240 --> 01:03.240 it the next time . So this time the 01:03.240 --> 01:05.351 aircraft is in the hangar for 11 days 01:05.351 --> 01:07.573 for a more extensive repair . We're now 01:07.573 --> 01:09.796 in the tank and we're doing a permanent 01:09.796 --> 01:12.849 repair and replacing that sealant 01:12.860 --> 01:15.614 that's actually in the . So this should 01:15.625 --> 01:19.334 give us a last . So this aircraft was 01:19.345 --> 01:21.525 initially set for 11 days of repairs . 01:21.605 --> 01:23.772 But when they were finishing up , they 01:23.772 --> 01:25.994 found some additional items they had to 01:25.994 --> 01:28.216 fix . So it was in the hangar for about 01:28.216 --> 01:30.438 13 days and now it's ready to return to 01:30.438 --> 01:32.383 the fleet . So we can continue the 01:32.383 --> 01:34.605 mission of the 55th Wing reporting from 01:34.605 --> 01:34.434 the fuel barn . I'm JB Artley for the 01:34.444 --> 01:36.555 55th Wing Public Affairs office where 01:36.555 --> 01:38.595 the sun never sets on the fight in 55th .